Previous Page
Next Page

4. INSTALLATION
1. Attaching the Nozzle plate to the toilet.
- Unfasten the nuts of the toilet seat to remove the toilet seat.
- Put the nozzle plate on the toilet.
- Align the center of the nozzle plate with the toilet, then tighten
the nuts securely.

2. Installing the main unit to the toilet
- Turn off the water at the shutoff valve.
- Flush the toilet twice to empty the bowl and tank. Place a small
pan below the shutoff valve and the fill valve to catch any water left
in pipes then unfasten fill valve nut.
- If your existing pipe "A" is a copper pipe, replace it with our
flexible hose A.
- If water supply pipe connection is 3/8", use the conversion nut
and the packing to attach the branching valve. In some cases, the
water supply pipe connection may be 1/2" in which case the conversion
nut may be omitted.
- Connect the hose A to the branching valve and tighten. You may
need to use a valve coupling nut.

Connecting the water supply to the main unit.
Use the hose B to connect the body joint of the main unit to the
branching valve. Tighten the coupling nuts at the body joint and the
branch outlet.

Previous Page
Next Page

BB-300 Operating & Installation Instructions - Contents
Important Safeguards :
Cautions Before Installation :
Parts Identification :
Installation :
Before Operation :
Trial Operation :
Operation :
Maintenance :
Specifications
|