Previous Page
Next Page

6. Trial Operation
1. Preparation
- Open the shutoff valve.
- Plug in the power cord. The indicator will light up. Start
supplying water to the water tank.
- The water tank will take about a minute to fill up.

2.
Operation Test
- Shield the nozzle with your hand to prevent the water
from spraying too far during the trial operation.
- Press the CLEANSING button to test the water stream.
- Adjust the water stream using HI/LO button.
3. Check for water leakage
Confirm that there is no water leakage from the connection.
Previous Page
Next Page

BB-300 Operating & Installation Instructions - Contents
Important Safeguards :
Cautions Before Installation :
Parts Identification :
Installation :
Before Operation :
Trial Operation :
Operation :
Maintenance :
Specifications
|