The Bidet Company | Bidets | About UCI | About Bidet | Contact Us | Inquiry | Warranty | Home

Last Updated:  Friday, June 06, 2008

 

 
Previous Page                     Next Page

6. Trial Operation

1. Preparation

  1. Open the shutoff valve.
  2. Plug in the power cord. The indicator will light up. Start supplying water to the water tank.
  3. The water tank will take about a minute to fill up.


2. Operation Test

  1. Shield the nozzle with your hand to prevent the water
    from spraying too far during the trial operation.
  2. Press the CLEANSING button to test the water stream.
  3. Adjust the water stream using HI/LO button.

3. Check for water leakage

Confirm that there is no water leakage from the connection.


Previous Page                     Next Page

BB-300 Operating & Installation Instructions - Contents
Important Safeguards : Cautions Before Installation : Parts Identification : Installation :
Before Operation : Trial Operation : Operation : Maintenance : Specifications

 


BioBidet by UCI, The Bidet Company Bio Bidet is Registered Trade Mark
All rights reserved 2003
205 Berg Street Algonquin, Illinois 60102
Tel: 847-854-7292  |  Fax: 847-854-1296
Customer ServiceDealer Inquiry | Site Map | Directory | SupremeBB-1000 Bidet Seat Prestige BB-800 Bidet Seat
Ultimate BB-600 Bidet Seat
| Universal BB-300 BidetPremium BB-i3000 Bidet Seat |  
Duo BB-250 Bidet | Envie BB-200 Bidet | Simplet BB-50 Bidet | Travel Portable Bidet TP-100 | UCI Bidets

Bidet Products & Distributorship Information